Expansion of the Paroikia Port at Paros Island

Prefecture of Cyclades

Project Description

PROJECT
Expansion of the Paroikia Port at Paros Island
PROJECT OWNER
Prefecture of Cyclades
GEOTECHNICAL STUDY
GEOCONSULT Ltd.
CONTRACTOR
ECOS S.A.
YEAR
December 1999 – February 2000

The project is located off-shore of the existing Paroikia Port of Paros Island and extends west (Telecommunications area quay) and east (Ag. Nikolaos quay) of the existing quay. The works include expansion of the existing quay (dimensions 100×60 m) as well as two quay walls of a total length of approximately 250 m on each side of the existing wharf with depths of 5 m for the Ag. Nikolaos quay and 7m for the Telecommunications area quay.

Performance of 9 off-shore CPTs, preparation of a factual and interpretive report and foundation proposals. General stability analyses of the wharfs.