EGNATIA ODOS MOTORWAY

EGNATIA ODOS S.A.

Project Description

PROJECT
EGNATIA ODOS MOTORWAY
PROJECT OWNER
EGNATIA ODOS S.A.
GEOTECHNICAL STUDY
GEOCONSULT Ltd.
CONTRACTOR
YEAR
July 1998 – June 2005

Egnatia Odos Highway starts from Igoumenitsa Port and with a general direction WSW – ENE, crosses Epirus, Macedonia and Thrace to end to the border station of Kipoi, to Turkey. The planned works included the construction of embankments, trenches, viaducts and tunnels.

The performed tasks included 70 rotary drilling and sampling boreholes summing up to approximately 1.497 m and 50 trial pits, accompanied by the corresponding laboratory tests and presentation of the results in the following locations:

Section 14.1.1 – “N. Karvali – Chrysoupoli junction”

Section 5.3 – “Interchange of Veroia”

Section 4.3.2 – “Polymilos Junction”

Section 1.1.2 – “Ladochori – Makrichora”

Section 1.1.3 – Likopodi – Makrichora”

Section 2.3 – “ Drosochori – Arachthos River”

Section 4.1.2s – “Panagia – Grevena”

Section 45.1.2 – “Raches – Aliakmonas” of the “Siatista – Krystalopigi” axis

Section R0902 – “Nigrita – Sochos” of the connection axis of Egnatia Odos