Construction of New Technology Ships Passenger Terminal – Lavrio Port

Project Description
PROJECT | Construction of New Technology Ships Passenger Terminal – Lavrio Port |
PROJECT OWNER | MINISTRY OF PUBLIC WORKS – MARINE AND AIRPORT FACILITIES DIRECTORATE (D4) |
GEOTECHNICAL STUDY | GEOCONSULT Ltd. |
CONTRACTOR | CASTOR S.A. |
YEAR | June 2011 – October 2011 |
The project is located at the north part of the commercial port of Lavrio. A 2-storey Passenger Terminal building of a total area of 2,700 m2 is going to be constructed. The ground floor will be used for arriving as well as departing passengers, whereas the 1st floor will be used for the departure of passengers via elevated closed corridors. The building will be made of reinforced concrete with a steel roof and it will be supported by large diameter (Æ800 mm) bored piles bearing into the bedrock.
Drilling of 3 exploratory boreholes of a total depth of 81 m and compilation of a factual and interpretive report. Design and performance of two pile load tests on sacrificial piles, with a maximum vertical load of 3,429 kΝ. Presentation and interpretation of the results of the pile load tests and review of the pile design.