Skip to main content

Completion of Kifisos River rehabilitation between Posidonos Av. and Solomou str. (chainnage 0+000 – 0+700) at Moschato

Ministry of Public Works

Project Description

PROJECT
Completion of Kifisos River rehabilitation between Posidonos Av. and Solomou str. (chainnage 0+000 – 0+700) at Moschato
PROJECT OWNER
Ministry of Public Works
GEOTECHNICAL STUDY
GEOCONSULT Ltd.
CONTRACTOR
J/V PARNON S.A. – EUROPAIKI TECHNIKI S.A.
YEAR
November 1997 – January 1998

The project is located at the part of Kifisos River between the coastal Ethnarxou Makariou Avenue (chainnage 0+000) and Solomou str. (chainnage. 0+700), at the Moschato area. The project includes the rehabilitation of Kifisos River bed between chainnage 0+000 and chainnage 0+700.

Drilling 13 exploratory boreholes (9 on-shore and 4 inside the river) of a total length of approximately 350 m, with the corresponding laboratory tests, preparation of a factual and interpretive report and proposals for excavation retaining structures with sheet pile walls, controlling ground water with jet grouting and controlling Kifisos River waters with embankments and rerouting pipes.

Photo Gallery