Tel.: (0030) 210 6004741 - Mail: [email protected]
  • en
  • el

New Passenger Terminal at Corfu Port

Port Authority of Corfu

Project Description

PROJECT New Passenger Terminal at Corfu Port
OWNER Port Authority of Corfu
PROJECT CONTRACTOR KOKKINOS S.A.
GEOTECHNICAL INVESTIGATION CONTRACTOR GEOCONSULT Ltd.
DATES OF GEOTECHNICAL INVESTIGATION January 1999 – April 1999

The project is located at the Mantouki Bay of the Corfu Port west of the existing Igumenitsa –Corfu F/B berthing dock, approximately 50 m from the coastline quay. The building consists of an elevated ground level and first floor and its structure is of reinforced concrete. Its foundation consists of large diameter bored piles.

Drilling 3 exploratory boreholes of a total length of approximately 36 m with the corresponding laboratory tests, preparation of a factual and interpretive report and foundation proposals. Piled foundation design.

Related Projects